How we re-roofed 38 occupied military homes through one of the wettest winters we’ve seen
VIVO, working on behalf of the Defence Infrastructure Organisation (DIO), brought us in to help re-roof and modernise 38 occupied homes at one of their sites in the West of England. With a tight schedule, families often away on training or deployment, and near-constant rain to contend with, the project called for some serious planning and flexibility.
The details
Overview:
Re-roofing and external upgrades on 38 occupied military family homes.
Location:
West of England
Timescale:
16 weeks
Works for each home included:
- Chimney removal, new fascia, soffit, rainwater goods, soil vent pipe adaptations, and roofing repairs.
- Removal of the cantilever porch roof and replaced with monopitch porches.
- Gable ends extended in preparation for future external wall insulation (EWI).
- A range of external upgrades: new fencing and gates, water butts, digital TV aerials, rotary washing lines, lighting, extractor fans and insulated loft hatches.
- Installed bat boxes, swift and bee bricks within the brickwork.
The challenges
The good old British weather
There was near-constant rain for around six weeks, in what the team described as one of the wettest winters they’d worked through. To keep the project moving, the schedule had to flex accordingly. Dry spells were used for stripping and weather-tighting roofs, wet days for tiling. Despite the conditions, we managed to finish just 4 weeks later than planned.
Protecting the birds and the bats
It wasn’t just the weather challenging the schedule. A survey found bats at four properties, including one maternal roost. Then birds arrived to nest in one of the unfinished roofs as we neared the end of the project. We worked closely with an ecologist to help us plan around and protect the bats, and an ornithologist was brought in to advise on the birds. With the ecologist’s guidance, we kept the bats undisturbed and the rest of the project on track, and the last roof remains on hold until the birds have moved on.
Building in future upgrades
When we replaced each roof, we also extended the gable ends to prepare the homes for external wall insulation in a future phase of work, which will save time and disruption when those upgrades come.
The people
Fitting in around busy military lives
With residents often away on training or deployment, coordinating access across the 38 families took careful planning. We appointed a family liaison officer with close ties to the community which gave the team a direct line to residents. Although much of the work was external, the role of our family liaison officer was essential to keep families reassured and updated, and also to coordinate access, adjust around frequent weather delays, and minimise disruption. In one case, we rescheduled roof works so as not to disrupt a resident sitting exams.
The impact
38 more military families with improved, more efficient homes, all set up for future phases of lifecycle improvements.
"As senior project manager overseeing bringing 174 void houses back online, my job was to make sure everything ran smoothly, on time and on budget. Chris and PAH really helped with that. They’re a very helpful company with excellent quality standards and H&S practices – the sort of company where you can relax and know the job will be done, and done to an excellent standard.What mattered most to me was client satisfaction. These are service personnel coming back from deployment, and when we did the walk-arounds with the MOD and DIO after completion, they were very impressed. We guarantee the houses for a year, and anything that came up, PAH dealt with it quickly. Every single service person was really impressed with both the standard of the homes and the aftercare."
David Days
Senior Project Manager, Mitie